Math Problem Statement

An assembly line produces 800 products per hour, with a standard deviation of demand during the lead time of 100. For every product they make, they use a Kanban system. The lead time from the inventory location to the assembly line is 2 hours. The boxes, the product is transported, carry 200 items, and the company uses an Alfa factor of 0.1. How many units will be there if they use a ROP system?

Solution

Ask a new question for Free

By Image

Drop file here or Click Here to upload

Math Problem Analysis

Mathematical Concepts

Inventory Management
Reorder Point (ROP)
Safety Stock
Lead Time Demand

Formulas

ROP = D \times L + \text{Safety Stock}
\text{Safety Stock} = Z \times \sigma_{LT}