Math Problem Statement

Supertankers off-load oil at a docking facility shore point 4 miles offshore. the nearest refinery is 8 miles east of the docking facility. a pipeline must be constructed connecting the docking facility with the refinery. the pipeline costs $300,000 per mile if constructed underwater and $200,000 per mile if over land.

Solution

Ask a new question for Free

By Image

Drop file here or Click Here to upload

Math Problem Analysis

Mathematical Concepts

Optimization
Geometry

Formulas

Cost function minimization

Theorems

-

Suitable Grade Level

Advanced Mathematics