Math Problem Statement
A can complete a piece of work in ‘a’ days by working ‘m’ hours per day, and B can complete the same work in ‘b’ days by working ‘n’ hours per day. If each of them reduces his working hours per day by 4 hours, each of them would take 5 days more to finish the work (m, n < 16). Which of the following is the time taken if A and B started working together such that A worked for ‘m’ hours per day and B worked for ‘n’ hours per day? (m, n, a, b are all integers) 1. 5 days 2. 4 days 3. 2.5 days 4. 10/3 days 5. 3 1/2 days
Solution
Ask a new question for Free
By Image
Drop file here or Click Here to upload
Math Problem Analysis
Mathematical Concepts
Work-rate problems
Algebra
Simultaneous equations
Formulas
Work = Time × Rate
Combined rate of work = Rate of A + Rate of B
a × m = b × n
(a + 5) × (m - 4) = a × m
Theorems
Work-rate theorem
Equation balancing
Suitable Grade Level
Grades 10-12