Math Problem Statement

Compute the plantwide predetermined overhead rate. During the year, Job 400 was started and completed. The following information pertains to this job: Direct materials $ 320 Direct labor cost $ 200 Machine-hours used 32 Compute the total manufacturing cost assigned to Job 400. If Job 400 includes 60 units, what is its unit product cost? If Moody uses a markup percentage of 130% of its total manufacturing cost, then what selling price per unit would it establish for Job 400?

Solution

Ask a new question for Free

By Image

Drop file here or Click Here to upload

Math Problem Analysis

Mathematical Concepts

Cost Accounting
Manufacturing Overhead
Markup Calculation

Formulas

Predetermined Overhead Rate (POHR) = Estimated Total Manufacturing Overhead / Estimated Total Machine-Hours
Total Manufacturing Cost = Direct Materials + Direct Labor + Applied Overhead
Applied Overhead = POHR × Machine-Hours used
Unit Product Cost = Total Manufacturing Cost / Number of Units
Selling Price per Unit = Unit Product Cost × (1 + Markup Percentage)

Theorems

-

Suitable Grade Level

Undergraduate - Business or Accounting